Rubber dam isolation
Pre-wedging
Careful removal of old amalgam restorations
Caries removal and cavity design with preservation of sound tooth structure
Surface treatment using air abrasion
Selective enamel etching
Matrix system application
Adhesive protocol using Clearfil SE Bond
Resin coating using flowable composite (AP-X Flow)
Proximal wall build-up using snowplow technique
Placement of EverX Posterior as dentin replacement
Incremental horizontal layering using Shofu LS composite
Occlusal adjustment
Finishing and polishing
Pre-operative with occlusal record
Isolation, Caries Removal and Cavity design
Matrixing; occlusal view
Matrixing;Seal Mesially
Matrixing;Seal Distally
Buccal view between 6,7
7,8
Oplus_131072
Post-operative radiograph
7 weeks follow up